A video of this procedure is available at YouTube: https://www.youtube.com/channel/
UCjqE4XzuvdHpVM9lXt41M8g/playlists
.
Step 1. Insert the VGA cable into the front I/O assembly; then; install and fasten two screws to secure the
VGA cable.
Figure 64. VGA cable installation
After you install the VGA cable, complete the following steps:
1. Reinstall the front I/O assembly (see “Install the front operator panel (2.5-inch HDD model)” on page 70).
2. Reinstall the air baffle if it was removed (see “Install the air baffle” on page 74).
3. Install the top cover onto the server (see “Install the top cover” on page 75).
4. Install the server into the rack if necessary.
5. Reconnect power cords and all external cables.
Install the VGA cable (3.5-inch HDD model)
Use this information to install the VGA cable for the 3.5-inch HDD model.
Before you install the VGA cable, complete the following steps:
1. Read the following section(s) to ensure that you work safely.
• “Installation Guidelines” on page 48
To install the VGA cable, complete the following steps:
Watch the procedure
A video of this procedure is available at YouTube:
https://www.youtube.com/channel/
UCjqE4XzuvdHpVM9lXt41M8g/playlists
.
Step 1. Insert the VGA cable into the slot on the front chassis; then, install the screws to secure the VGA
cable.
72
ThinkSystem SR250 Setup Guide