EasyManua.ls Logo

Lenze 8400 BaseLine C - Page 56

Lenze 8400 BaseLine C
113 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Electrical installation
Installation according to EMC (installation of a CE-typical drive system)
Installation in the control cabinet
6
56
EDS84ABD302 EN 4.0
Continuation of cable routing
Separation of the ”hot” motor cable from the control, signal, and mains cables:
ƒ Never install motor and signal cables in parallel and only cross at right angles
ƒ The c ables of a 24 V power supply unit (plus and minus cable) must be installed
closely together over their entire length in order that no loops may occur.
Line filter
Line filter
8400
8400
SPS
Mains fuses Mains contactors
Fuses
24V power supply unit
Motor
contactors
Relays
Wiring terminals
Cable duct for signal and mains fuses
Cable duct for motor cables
8400GGx008
Fig. 6-5 Cable routing in the control cabinet
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com

Table of Contents

Other manuals for Lenze 8400 BaseLine C

Related product manuals