Commissioning
Before switching on
7
82
EDS84ABD302 EN 4.0
7 Commissioning
Note!
Please observe the general safety instructions and the residual hazards in
chapter 2.1 and 2.3.
7.1 Before switching on
Note!
ƒ Comply with the corresponding switch-on sequence.
ƒ In case of faults during commissioning please use:
– the online help in the »Engineer«
– the software manual 8400 BaseLine D
– the software manual 8400 BaseLine C
To prevent injury to persons or damage to material assets, check ...
... before connecting the mains voltage:
ƒ Wiring for completeness, short circuit, and earth fault
ƒ The”EMERGENCYSTOP”functionoftheentiresystem
ƒ The motor circuit configuration (star/delta) must be adapted to the output voltage
of the controller
ƒ The in-phase connection of the motor (rotational direction)
... the most important drive parameter settings before the controller is enabled:
ƒ Is the V/f rated frequency adapted to the motor circuit configuration?
ƒ Are the drive parameters relevant for your application set correctly?
ƒ Is the configuration of the analog input and the digital inputs adapted to wiring?