Commissioning
Preparing the commissioning procedure
7
86
EDS84ABD302 EN 4.0
7.4 Preparing the commissioning procedure
You need the following for commissioning:
ƒ The integrated keypad
ƒ Mains voltage
or
ƒ Computer with Windows® operating system (XP or 2000)
ƒ Lenze PC software »Engineer«
ƒ Connection with the controller via an interface, e.g.
– Diagnostic interface X6 with USB diagnostic adapter
ƒ Software manual for the technology application used
ƒ The communication manual for the network of the automation platform
ƒ Mains voltage
Follow the instructions of the software and/or read the documentation.