Commissioning
Test commissioning
Test commissioning with terminal control
7
90
EDS84ABD302 EN 4.0
7.5.2 Test commissioning with terminal control
Step-by-step commissioning
1. Wiring of power terminals
Make use o f the ”Electrical installation” chapter or the Mounting Instructions to wire the
power terminals according to the requirements of your device.
2. Wiring of control terminals.
Wiring of the analog input at X4 Assignment Terminal control
DI1DI2
DI3
DI4
RFR
X4
24EDO1
12I
AR
A1U
GND
0 10V...
1k
10k
W
...
W
A1U Setpoint selection
10 V (=100 %):
1500 rpm (for 4-pole motor)
Wiring of the digital inputs at X4 Assignment Terminal control
AR
A1U
GND
DI1DI2
DI3
RFR
X4
DO1 12I24E
DI4
RFR z Controller enable: RFR = High
z Error reset:
High Low (edge-controlled)
DI1
Fixedfrequency1...fixedfrequency3,see
below table
DI2
DI1 ... DI4: all active = High DI3 DCB
DI4 Direction of rotation
counter-clockwise/clockwise (CCW/CW)
3. If you can be sure that the frequency inverter is in the default state (Lenze setting),
you can skip this commissioning step. If not, establish the Lenze setting of the
frequency i nverter as follows:
-0-
_
`
PASS
2 sec.
0000
_
`
....
`
....
....

`
_
_
_
`
....
C002
c001
01
-1-
8888
_
`
....
84BLMEN001
z Select menu -1- (all parameters)
z Press ”Enter” key
z Set C002 code
z Press ”Enter” key
z Set c001 subcode
z Press ”Enter” key
z Set value ”01”
z Press ”Enter” key