Chapter 10 Installation and wiring MASTER-K
10-9
3) K1000S
- Insert the module fixing projections in the lower part into the module fixing hole in the
base board.
- Install the module onto the base board by pushing the top forward.
- Check that the module is firmly mounted onto the base board by pulling the upper
part of the module.
When the PLC system is located at the place with a serious vibration and shocks, fix a
module to a base board more surely by fastening a screw.