Loading...
Heavy load lattice extension
6.2 Rigging the heavy load lattice extension
Lattice extension operating instructions 3 112 441 en 6 - 13
GMK 4100/4100-L/5095
11.01.2008
On the right side
If, additionally, a hook block is reeved on the main boom, connect the sec-
ond lifting limit switch to the socket on the right side of the main boom
head;
à Operating instructions of the truck crane.
If no hook block is reeved on the main boom, the bridging plug must be
plugged into the socket that is not used;
à Operating instructions of the
truck crane.
Disconnecting the electrical connection
Remove the lifting limit switch (2) from the
clamp (1).
Attach the retaining pin to the lifting limit
switch.