Heavy load lattice extension
6.2 Rigging the heavy load lattice extension
6 - 12 3 112 441 en Lattice extension operating instructions
GMK 4100/4100-L/5095
11.01.2008
6.2.5 Lifting limit switch and anemometer
Lifting limit switch Establishing the electrical connection
For each reeved hoist rope, a lifting limit switch must be installed;
à Operating instructions of the truck crane.
On the left side
Fit the lifting limit switch (2) onto the holder
(1) and secure it with the retaining pin.
Install the lifting limit switch weight and lay
it around the hoist rope;
à Operating
instructions
of the truck crane.
Remove the bridging plug (3) from the
socket (1) and plug it into the dummy
socket (2).
Unwind the cable from the clamp (5).
Remove the plug (4) from the dummy socket
(6) and plug it into the socket (1).
Wind the connecting cable of the plug (4)
onto the holder (5).
Insert the plug of the lifting limit switch into
the socket (7).
Position the connecting cable so that it will
not be damaged during crane operation.