EasyManua.ls Logo

Manitowoc GROVE GMK 4100 - Slinging Points

Manitowoc GROVE GMK 4100
286 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
For operations planning
2.2 Swing-away lattice
Lattice extension operating instructions 3 112 441 en 2 - 5
GMK 4100/4100-L/5095
11.01.2008
2.2.4 Slinging points
Observe the notes on Slinging points; à p. 2 - 2.
Only use the connection eyes (1) or (2). Use the different connection eyes
depending on whether section 2 is folded or swung out.

Table of Contents

Related product manuals