EasyManua.ls Logo

Manitowoc GROVE GMK 4100 - Slinging Points; Transport

Manitowoc GROVE GMK 4100
286 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
For operations planning
2.3 Boom extension
Lattice extension operating instructions 3 112 441 en 2 - 9
GMK 4100/4100-L/5095
11.01.2008
2.3.4 Slinging points
Observe the notes on Slinging points; à p. 2 - 2.
Section 3 and section 4 each have two sling-
ing points (1).
2.3.5 Transport
Observe the notes on Transport; à p. 2 - 2.
Place section 3 or section 4 on the supports
(1) at the front and rear for transport.
Secure the lattice extension on the transport
vehicle with belts to prevent it from slipping
and overturning.

Table of Contents

Related product manuals