EasyManua.ls Logo

Manitowoc GROVE GMK 4100 - Page 235

Manitowoc GROVE GMK 4100
286 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Turning loads
7.3 Turning a load
Lattice extension operating instructions 3 112 441 en 7 - 5
GMK 4100/4100-L/5095
11.01.2008
(A) – First, sling the load only to the hook
block of the lattice extension (rope of the
auxiliary hoist).
Raise the load completely with the lattice
extension.
(B) – Only now, attach the load to the hook
block of the main boom as well (main hoist
rope).
(A) – Now lift the load with the hook block on
the main boom until both slinging points are
at the same height.
(B) – Slacken the hoist rope on the lattice
extension until the load is only hanging
from the hook block on the main boom.
The load has now been completed turned.

Table of Contents

Related product manuals