Maintenance work on the carrier
7.9 Axle lines
09.03.2018
Maintenance manual 3 302 746 en 7 - 65
GMK5200-1
4
th
axle line The drive has two oil chambers.
• Place a receptacle under screws (3) and (4).
• Remove screws (1), (2), (3) and (4) and let
the oil drain off.
• Fit new gaskets and tighten screws (3)
and (4).
• First add 1.5 l (0.4 gal) oil through the
hole (2).
• Add more oil through the hole (1), up to the
lower edge of the hole (1).
• Fit new gaskets and tighten screws (1)
and (2).
S
Risk of oil overheating.
When topping up the oil, both openings must be opened so that both oil
tanks are filled equally. This prevents both oil tanks from being overfilled
and thus the oil from overheating.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5200-1 and is the answer not in the manual?

Manitowoc Grove GMK 5200-1 Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5200-1
CategoryConstruction Equipment
LanguageEnglish

Related product manuals