EasyManua.ls Logo

Manitowoc Grove GMK 5200-1

Manitowoc Grove GMK 5200-1
346 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance overview
5.2 Maintenance plans
5 - 18 3 302 746 en Maintenance manual
GMK5200-1
09.03.2018
5.2.11 Maintenance plan Y 10
Y 10
Maintenance work on the CARRIER:
every 120 months/after 200,000 km (124,000 mi)
Steel fabrication
Check the load-bearing steel fabrication. For further information,
please contact
Manitowoc Crane Care.
Maintenance work on the SUPERSTRUCTURE:
every 120 months/after 12,000 oper. hrs.
Electrical system
Have the battery on the electronics board replaced à p. 8 - 76
Steel fabrication
Check the load-bearing steel fabrication. For further information,
please contact
Manitowoc Crane Care.
Rated capacity limiter (RCL)
Have the RCL checked by Manitowoc Crane Care.

Table of Contents

Related product manuals