I-2
Index Comet Executive Gas
E
Electrical
Check Mechanical and Electrical Connections
4-16
Checkout Exhaust Blower Motor Rotation Check-
out 2-17
Connection 2-8
Main Power 2-10
Sail Switch and Exhaust Blower Motor 2-8
Electrical System
About 5-2
Disconnect Switch and Fuses 5-3
Electrical Panel 5-4
Step-Down Transformer 5-3
Troubleshooting 6-4
Endframe Controls. See Operating Controls
Exhaust Blower
About 5-7
Installation 2-5
Ductwork 2-5
Electrical Connection 2-8
Installing the Exhaust Blower 2-6
Locating the Exhaust Blower 2-6
Ventilating the Work Area 2-7
Motor Rotation Checkout 2-17
Exhaust System 5-7
Exhaust Blower, About 5-7
Sail Switch, About 5-7
Troubleshooting 6-16
F
Feed Section 7-4
Drive Roll Friction Material Replacement 7-8
Feed Table Alignment and Positioning 7-13
Guide Tape Replacement 7-10
Ribbon
Replacement 7-6
Tension Adjustment 7-5
Final Protective Wrapper Removal 2-15
Final Rinse, Conditioning Flatwork Before Ironing
3-13
Flatwork Handling 3-9
Ironing Cylinder 3-10
Maximum Eciency 3-9
Safety 3-9
Friction Material Replacement
Feed Ribbon Drive Roll 7-8
Return Ribbon Drive Roll 7-40
G
Gas Burner Removal/Replacement 7-29
Gas Connection
Checkout 2-20
Gas Supply 2-20
Ignition Test 2-23
Inspect Gas Piping 2-22
Overview 2-12
Shut-O Valve Installation 2-13
Gas Pressure Check 4-16
Gas Supply Checkout 2-20
General Cleanliness 4-3
Grease
Monthly Bearings 4-14
Weekly Bearings 4-8
Guide Tape
Check 4-4
Replacement 7-10
H
Hardened Ring Replacement, Ironing Cylinder 7-27
Heating System 5-7. See also Burner System
Burner System Components 5-9
Temperature Control 5-10
Temperature Sensor Contact Shoes 5-10
Troubleshooting 6-12
Burner Ignition 6-13
Burner Operation 6-14
High Temperature Limit Control
Replacement 7-34
I
Ignition Test, Installation 2-23
Inspect
Gas Piping 2-22
Installation 2-3
Installation Procedures 2-3
Electrical Connection 2-8
Exhaust Blower Installation 2-5
Final Protective Wrapper Removal 2-15
Gas Connection 2-12
Inspection 2-3
Receiving Shelf Set-Up 2-14
Uncrating and Positioning 2-4
Installing the Exhaust Blower 2-6
Ironing Cylinder
Check 4-7
Flatwork Handling 3-10
Hardened Ring Replacement 7-27