EasyManua.ls Logo

Maxi Comet Executive Exec-56-G - Page 241

Default Icon
244 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Comet Executive Gas Index
I-3
Paper Removal 2-19
Reconditioning 7-24
Temperature, Unit Settings 3-14
Waxing 4-5
Ironing Quality Troubleshooting 6-9
Ironing Section 7-23
Drive Chain Tension Adjustment 7-23
Ironing Cylinder Hardened Ring Replacement
7-27
Ironing Cylinder Reconditioning 7-24
Ironing Speed, Unit Settings 3-14
J
Jams, Clearing Safely 3-10
JOG REVERSE Operation Stage, Sequence of
Operation 5-11
L
Left Endframe Controls 3-5
Locating the Exhaust Blower 2-6
M
Main Disconnect Switch 1-4, 3-2
Main Power Connection 2-10
Maintenance and Repair Safety 1-3
Manual Scope 1-2
Maximum Eciency, Flatwork Handling 3-9
Maximum Productivity 3-15
Mechanical Start-Up Stage, Sequence of Operation
5-12
Mechanical System
About 5-5
Drive System 5-5
Ribbon Sets 5-6
Troubleshooting 6-6
Missing or Broken Ribbon Replacement
Feed 7-7
Return 7-39
Moisture Retention, Conditioning Flatwork Before
Ironing 3-13
Monthly PM (200 Hours) 4-13
Check
Compression Roll Pressure and Padding Condi-
tion 4-15
Setscrews 4-13
Grease Bearings 4-14
Oil Drive Chains and Tension Springs 4-14
O
Oil
Drive Chains and Tension Springs 4-14
Roll Bearing Pivots 4-10
Operating Controls 3-4
Left Endframe Controls 3-5
Right Endframe Controls 3-4
Operating Techniques 3-12
Conditioning Flatwork Before Ironing 3-12
Maximum Productivity 3-15
Processing Standards 3-15
Unit Settings 3-14
P
Parts Availability, Repair 7-3
Pilot Assembly
Check and Clean 4-18
PM Task Tables
Daily, Weekly Tasks 4-1
Monthly, Semi-Annual Tasks 4-2
Positioning the Unit 2-4
Pre-Operational Checkout 2-15
Checkout Completion 2-25
Cleaning the Unit 2-25
Exhaust Blower Motor Rotation Checkout 2-17
Gas Connection Checkout 2-20
Ironing Cylinder Paper Removal 2-19
Safety Device and Control Function Checkout
2-18
Security of Hardware 2-16
Pressure Adjustment, Compression Roll 7-18
Pressure Check, Compression Roll 7-17
Preventive Maintenance
Annual PM (2000 Hours) 4-17
Daily PM (8 Hours) 4-3
Monthly PM (200 Hours) 4-13
Semi-Annual PM (1000 Hours) 4-15
Task Tables
Daily, Weekly Tasks 4-1
Monthly, Semi-Annual Tasks 4-2
Weekly PM (50 Hours) 4-6
Processing Standards 3-15
R
Receiving Shelf Set-Up 2-14
Reconditioning, Ironing Cylinder 7-24
Repair
Parts Availability 7-3
Safety Considerations 7-2
Return Section 7-36
Drive Roll Friction Material Replacement 7-40
Ribbon
Replacement 7-38
TOC
INDEX

Table of Contents

Related product manuals