Comet Executive Gas Index
I-3
Paper Removal 2-19
Reconditioning 7-24
Temperature, Unit Settings 3-14
Waxing 4-5
Ironing Quality Troubleshooting 6-9
Ironing Section 7-23
Drive Chain Tension Adjustment 7-23
Ironing Cylinder Hardened Ring Replacement
7-27
Ironing Cylinder Reconditioning 7-24
Ironing Speed, Unit Settings 3-14
J
Jams, Clearing Safely 3-10
JOG REVERSE Operation Stage, Sequence of
Operation 5-11
L
Left Endframe Controls 3-5
Locating the Exhaust Blower 2-6
M
Main Disconnect Switch 1-4, 3-2
Main Power Connection 2-10
Maintenance and Repair Safety 1-3
Manual Scope 1-2
Maximum Eciency, Flatwork Handling 3-9
Maximum Productivity 3-15
Mechanical Start-Up Stage, Sequence of Operation
5-12
Mechanical System
About 5-5
Drive System 5-5
Ribbon Sets 5-6
Troubleshooting 6-6
Missing or Broken Ribbon Replacement
Feed 7-7
Return 7-39
Moisture Retention, Conditioning Flatwork Before
Ironing 3-13
Monthly PM (200 Hours) 4-13
Check
Compression Roll Pressure and Padding Condi-
tion 4-15
Setscrews 4-13
Grease Bearings 4-14
Oil Drive Chains and Tension Springs 4-14
O
Oil
Drive Chains and Tension Springs 4-14
Roll Bearing Pivots 4-10
Operating Controls 3-4
Left Endframe Controls 3-5
Right Endframe Controls 3-4
Operating Techniques 3-12
Conditioning Flatwork Before Ironing 3-12
Maximum Productivity 3-15
Processing Standards 3-15
Unit Settings 3-14
P
Parts Availability, Repair 7-3
Pilot Assembly
Check and Clean 4-18
PM Task Tables
Daily, Weekly Tasks 4-1
Monthly, Semi-Annual Tasks 4-2
Positioning the Unit 2-4
Pre-Operational Checkout 2-15
Checkout Completion 2-25
Cleaning the Unit 2-25
Exhaust Blower Motor Rotation Checkout 2-17
Gas Connection Checkout 2-20
Ironing Cylinder Paper Removal 2-19
Safety Device and Control Function Checkout
2-18
Security of Hardware 2-16
Pressure Adjustment, Compression Roll 7-18
Pressure Check, Compression Roll 7-17
Preventive Maintenance
Annual PM (2000 Hours) 4-17
Daily PM (8 Hours) 4-3
Monthly PM (200 Hours) 4-13
Semi-Annual PM (1000 Hours) 4-15
Task Tables
Daily, Weekly Tasks 4-1
Monthly, Semi-Annual Tasks 4-2
Weekly PM (50 Hours) 4-6
Processing Standards 3-15
R
Receiving Shelf Set-Up 2-14
Reconditioning, Ironing Cylinder 7-24
Repair
Parts Availability 7-3
Safety Considerations 7-2
Return Section 7-36
Drive Roll Friction Material Replacement 7-40
Ribbon
Replacement 7-38