Introduction
This manual provides information about the MicroTech® Open Protocol Master (OPM) Panel. It
describes the components, field wiring options and requirements, network commissioning procedures,
and service procedures. The OPM Panel is used when integrating two or more MicroTech unit or
auxiliary controllers into another company’s building automation system (BAS).
For specific information about unit or auxiliary controllers, refer to the appropriate MicroTech
controller installation manual (see Table 1). For installation and commissioning instructions and
general information on a particular unit, refer to its model-specific installation manual.
Table 1. MicroTech Controller Installation Literature
MicroTech unit or
auxiliary controller Installation & Maintenance Data bulletin number
Series-100 centrifugal chiller IM 403
Series-200 centrifugal chiller IM 616
Reciprocating chiller IM 493
Screw chiller IM 549
Applied rooftop IM 483
Self-contained air conditioning IM 608
Series-100 unit ventilator IM 509
Series-300 unit ventilator IM 613
MicroTech Loop Water Controller IM 431
{
MicroTech Absorption Gateway IM 620
|
MicroTech Communications
Gateway
IM 661
Notes:
1. The MicroTech Absorption Gateway (MAG) is an interface to McQuay absorption chillers, which use Sanyo controllers.
2. The MicroTech Communications Gateway (MCG) is an interface to McQuay water source heat pumps, which use MicroTech
2000™ controllers. When there are only MicroTech 2000 controllers, an MCG can substitute for an OPM Panel.
!
WARNING
Electric shock hazard. Can cause personal injury or equipment damage.
This equipment must be properly grounded. Connections and service to the MicroTech control
panel must be performed only by personnel that are knowledgeable in the operation of the
equipment being controlled.
!
CAUTION
Static sensitive components. A static discharge while handling electronic circuit
boards can cause damage to the components.
Discharge any static electrical charge by touching the bare metal inside the control panel before
performing any service work. Never unplug any cables, circuit board terminal blocks, or power
plugs while power is applied to the panel.