EasyManua.ls Logo

Mec 6092RT - Quarterly Inspection Checklist

Mec 6092RT
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
93808 – October 2014 Page 29
6092RT Machine Inspections and Maintenance
Quarterly Inspection Checklist
This checklist must be used at quarterly intervals or every 300 hours of machine use, whichever occurs
first. Failure to do so could result in death or serious injury.
Scheduled Maintenance Inspections should be conducted by qualified service technicians only. Photocopy this page for reuse. Keep
inspections records up to date. Record and report all discrepancies to your supervisor.
Model Number _______________ Serial Number ________________________ Hour Meter Reading _________________
Initial Description
BBBBBBB Perform all checks listed on Prestart/Monthly Inspection.
BBBBBBB Check the operation speeds to ensure they are within specified limits (see Specifications).
BBBBBBB Check the emergency lowering system.
BBBBBBB Clean and lubricate all push button switches with dry lubricant and ensure that the switches operate freely in all
positions.
BBBBBBB Check the tightness of the platform frame and the linkage pins.
BBBBBBB Check the overall platform and guardrail component stability.
BBBBBBB Check the electrical mounting and hardware connections for security.
BBBBBBB Check the king pins for excessive play.
Additional maintenance requirements for severe conditions
BBBBBBB Replace hydraulic filter element (under normal conditions replace every six [6] months).
DATE________INSPECTED BY __________________________________________

Related product manuals