EasyManua.ls Logo

Metallkraft PRM 10 E - Operation of the Machine

Default Icon
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation of the machine
PRM 10 E | Version 1.05 | EN 19
8 Operation of the machine
Start ring bending machine The motor bending machine is set to operational readiness with the following
steps:
Step 1: Connect the mains plug to the power source. Check that all electrical
connections are correct.
Step 2: Set the main switch (5) on the electrical box from "0" to "1". The
operation indicator lights.
Step 3: Press the START button. The machine is ready for operation.
Step 4: Press the rollers with the pedals.
Step 5: Insert material, move the rollers with the pedals and carry out the ben-
ding work.
Step 6: After completion of the bending work, press the STOP button and set
the main switch from "1" to "0". The machine is out of service.
Wear ear protection!
Wear eye protection!
Wear safety gloves!
Wear safety shoes!
Wear protective clothing!
NOTE!
Please observe the following before operating the machine.
- The mains voltage must correspond to the voltage specifi-
cations on the rating plate.
- The main switch must be set to "0".
- The safety devices as well as the protective covers must be
functional.
ATTENTION!
Please make sure that the emergency stop button is reset to its
original position after use. If the emergency stop button remains
pressed, the machine will not start.