Millipore Milli-Q Plus - Initial Startup and Air Purge

Millipore Milli-Q Plus
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
B.
Installation
7.
Initial Start Up
Checklist: - battery in place and activated
- water connected to rear of unit
- power cable plugged into rear socket
- pack inserted/handle locked
- isolating valve on feed water line open
- switch system ON/OFF switch to ON position
to initiate Microprocessor
Control and Display Layout
- "battery" is displayed 2 seconds
every 7 seconds
switch system ON/OFF to OFF posi
for 3 seconds to reset battery display
every 7 seconds
- switch system ON/OFF to OFF position Display
Air Purge
In order to purge all of the air from a newly installed pack
it is necessary to run some water to drain.
New Pack in Place - Checklist OK
Connect adapter and tubing from
point-of-use to drain.
Open point-of-use valve. Turn to
PRODUCTION.
Press OPERATE/STANDBY to switch
the system to operate mode.
Allow water to collect in a
vessel with the tubing submerged
in the vessel.