EasyManuals Logo

Mitsubishi PLK-E2010R User Manual

Mitsubishi PLK-E2010R
53 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #26 background imageLoading...
Page #26 background image
- 21 -
7-2 Adjustment of the position between the needle and the rotating hook.
1) Turn the power switch OFF.
2) Open the cylinder cover (No.1).
3) Loosen the set screws and remove the sliding plate (No.2).
4) Remove the bobbin case (No.3).
5) Loosen the hook sets crews (No.4).
6) Turn the sewing machine pulley by hand then, move up the needle bar (No.5) from the lowest position
and stop it at the position (No.6) where the needle bar timing mark C is matched to the needle bar
bushing bottom line.
NOTE
If the needle class is DPX5, match the needle bar timing mark D to the needle bar bushing
bottom line.
7) Turn the hook by hand and stop it at the position where the hook point (No.7) meets with the center
line of the needle (No.8).
8) Move the look by hand and adjust the clearance between the hook point and the needle to be about
0.005 mm.
9) Hold the hook and tighten the hook set screws (No.4) securely.
10) After the adjustment, put the sliding plate (No.2) and bobbin case (No.3) back to the original
locations and close the cylinder cover (No.1).
NOTE
When put the sliding plate (No.2) back on the sewing machine, in order for the needle (No.9)
to come into the right center of the needle hole of the needle plate (No.10), make sure that the
needle plate hole center matches with the needle point then, tighten the set screws securely.
3)
2)
1)
5)
4)
D
C
9)8)
3)
7)
8)
7)
8)
6)
0.05mm
7)
8)

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mitsubishi PLK-E2010R and is the answer not in the manual?

Mitsubishi PLK-E2010R Specifications

General IconGeneral
BrandMitsubishi
ModelPLK-E2010R
CategorySewing Machine
LanguageEnglish

Related product manuals