EasyManua.ls Logo

Miyachi MG3D - And; Flow Chart Channel; Evaluation Time of the Respective Channel that Measures First

Miyachi MG3D
82 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating Instructions MG3 Digital
Integration in Automated Installations
76609409EN-BA-MG3D-V1_6.docx 71/82 2010-08-02
6.5 Flow Chart Channel 1 and Channel 2 with Parallel Measuring
within the Evaluation Time of the Respective Channel that
Measures First
Misadjusted flow!
Second channel starts measuring without ready signal being “high”.
Remedy:
Extend channel 1 measuring time such that it overlaps with the second measuring
time.
Dia5-MG
high
low
high
low
high
low
high
low
high
low
high
low
Current 1 Output
Current 2 Output
Ready Output
Outputs
Current 1
Current 2
measuring delay
Ready
for new
measuring
adjusted measuring time channel 1
no new measuring possible!
wrong measuring!
(Current starts though
ready is not yet active)
undetermined undetermined

Table of Contents