27MCP15-500.7
START-UP PROCEDURE - CONTINUED
Stacked Master/Slave Furnaces jStacked Slave Furnaces (Opposite Side of Cabinet) j
Figure 27.1 - Gas Heat Option Gas Controls - D-Cabinet Sized Units - 900,000 Btu/hr and Larger (81% Eff)
Slave Furnace “B” k
Master Furnace k
Slave Furnace “A” k
Slave Furnace “C” k
j Refer to Figure 23.3 for location of furnace positions.
k Refer to Figure 26.1 for idenfication of furnace
components.
j Refer to Figure 23.3 for location of furnace positions.
k Refer to Figure 26.1 for idenfication of furnace
components.