6 Installation and commissioning
56 5831400/02 EN
3. Mark this position above the gland on the cable sheath.
Figure37: Marking the cables
4. Pull the cables back out to a length of 10mm from the marking.
Figure38: Pulling the cables out
5. Attach the cable gland to the device housing (wrench size30).
6. Tighten the pressure screw on the cable gland (wrench size30) with ap-
prox. 15Nm.
Cable example (suitable for winding temperature indicators up to 50°C am-
bient temperature and for oil temperature indicators up to 65°C ambient
temperature):