EasyManua.ls Logo

MR MSENSE DGA 2/3 - Page 48

MR MSENSE DGA 2/3
104 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 Mounting
Maschinenfabrik Reinhausen GmbH 202348 4001150/12 ENMSENSE
®
DGA 2/3
2. Fill the holes in the housing base with grease.
Time period: At least every 2 years.
Figure36: Holes in the housing base
3. Apply grease to the ball valve steel clamping ring liberally.
Avoid greasing the interior of the ball valve.
Time period: After each mounting or removal process; at least every 2
years.
Figure37: Ball valve steel clamping ring
4. Completely cover the grounding point on the ball valve with grease.
Time period: After grounding the ball valve; at least every 2 years.

Table of Contents

Related product manuals