EasyManua.ls Logo

MSA LUNAR - Page 13

MSA LUNAR
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
(2) Slide the Retractor (02) up the G1 SCBA strap
tunnel (06) until the Split D-ring (01) is above the
specified stitch.
(3) From outside of the G1 SCBA strap tunnel (06),
secure the Retractor (02).
(4) Reach into the G1 SCBA side access tunnel
(08). At this point, the Split D-ring (01) should be
in front of the webbing.
MSA LUNAR 13
US 4 Basic Operation

Related product manuals