EasyManua.ls Logo

MTU C13 - 4 Operation; Preparations for Recommissioning the Engine after Extended Out-Of-Service Periods (>3 Months)

MTU C13
163 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 Operation
4.1 Preparations for recommissioning the engine after extended
out-of-service periods (>3 months)
Preconditions
Engine shut down and secured against being restarted.
MTU Corrosion-proofing and Reproofing Regulations (A001070/..) are available.
Recommissioning after long out-of-service periods (>3 months)
Item Action
Engine Remove corrosion-proofing (→ MTU Corrosion-proofing and Reproofing Regu-
lations A001070/..).
Valve gear Lubricate valve gear every ≥ 6 months (→ Page 90).
Oil lubrication system Check engine oil level (→ Page 110).
Crank engine using starting system (→ Page 80).
Fuel prefilter Fill with fuel (if fitted).
Coolant system If engine has been out of service for more than 1 year, change engine cool-
ant (→ Page 123).
Change charge-air coolant (→ Page 133).
Coolant system Check engine coolant level (→ Page 122);
Check charge-air coolant level (→ Page 132).
Coolant system Preheat coolant with coolant preheating unit (if available).
Engine Control Unit Check electrical connections (→ Page 151).
High-pressure fuel pump Only on engines without oil priming pump
Fill HP fuel pump with fresh engine oil (→ Page 96).
M015695/03E 2013-03 | Operation | 49
TIM-ID: 0000002200 - 005

Table of Contents

Related product manuals