MTU C13 - Putting the Engine into Operation after Scheduled Out-Of-Service-Period

MTU C13
163 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.2 Putting the engine into operation after scheduled out-of-
service-period
Preconditions
Engine is stopped and starting disabled.
Startup
Item Action
Lube oil system Check engine oil level (→ Page 110).
Coolant circuit Check engine coolant level (→ Page 122);
Check charge-air coolant level (→ Page 132).
Coolant circuit Preheat coolant with coolant preheating unit (if applicable).
Engine control system Put into operation.
50 | Operation | M015695/03E 2013-03