System Hardware Manual - 21
Doc. No. 8846 - Release 1.1
September 2004
Installing the Main KSU Chapter 4
S
ECTION
1
BEFORE INSTALLING
THE KSUS
1.1 General Precautions
To avoid shock or damage, do not plug in or turn the system power
on before completing the installation process.
Avoid working with the KSU during electrical storms.
Use only commercial AC power to prevent shock or fire.
Use the power cord supplied for the KSU.
Do not bundle AC Power cords together, the cords may over heat.
Make sure the KSU has proper Earth ground connected to the
earth terminal.
1.2 Unpacking
Unpack the KSU and check it against the following list. Inspect for
physical damage.
1.3 Preparations
Make sure the necessary tools (Screw Driver Set, Pliers Set, etc)
are propertied.
Make sure you have a building plan showing common equipment,
extensions, the telecom demarcation, and earth ground location.
The installation site must meet the following Site / Environmental
Requirements.
1.4 Site Requirements
The system should be wall-mounted only
. Ensure that enough
space is available to allow the installation of KSUs and/or OPBOX.
A dedicated 110/240VAC circuit located within 2 meters of the KSU
is required. A separate dedicated AC outlet is necessary for each
KSU.
1.5 Environmental Requirements
Meeting established environmental standards maximizes the life of the
system. Be sure that the site is not :
Items List of Contnets QTY
924M KSU 924M KSU 1
AC Power Cord 1
Screws (M4.1x25) 4
Template for Wall Mounting 1