EasyManua.ls Logo

NEC Xen Topaz - Unpacking; Installing the 308 E;008 E PCB

NEC Xen Topaz
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
September 2004 NEC Business Solutions Ltd
30 - Trunk/Extension Cabling and Installing the Expansion PCBs
Doc. No. 8846 - Release 1.1
September 2004
2.2 Unpacking
Unpack the 308E/008E and check it against the following list. Inspect
for physical damage.
2.3 Installing the 308E/008E PCB
1. Open and pull out the Sub-Cover.
2. Loosen two screws and remove the Main-Cover.
3. Insert two Nylon-Spacers into the specified holes, and fasten two
Metal-Spacers into the specified holes. (Both Nylon and Metal
Items List of Contents QTY
308E-A1 308E-A1 PCB 1
Nylon Spacers 2
Metal Spacers 2
Screws 2
008E-A1 008E-A1 PCB 1
Nylon Spacers 2
Metal Spacers 2
Screws 2

Table of Contents

Other manuals for NEC Xen Topaz

Related product manuals