COMFORT FUNCTIONS
STORAGE PRIORITY
COLD START FEATURE
The cold start feature is useful in cold climate conditions when there are long runs of pipe
work.
When this function is enabled, the switch-on temperature differential (dT ON) between the
collector and the cylinder is increased to 10°C if ever the collector temperature is lower than a
set limit (T1 COLD) and the solar pump has not run for 3 hours.
7KHLQVWDOOHUFDQGHÀQHDPLQLPXPUXQGXUDWLRQIRUWKHVRODUSXPSRUPLQ
:KHQDF\OLQGHUV\VWHPLVVHOHFWHGDSULRULW\F\OLQGHUFDQEHGHÀQHG
If one cylinder is higher priority
7KH35,2VHWWLQJLQWKH©6HW&RQÀJªPRGHGHÀQHVZKLFKF\OLQGHULVKLJKHVWSULRULW\WKHVWRUDJH
priority sets the priority according to which the storage cylinders are loaded.
,IWKHÀUVWSULRULW\F\OLQGHUWHPSHUDWXUHGLIIHUHQFHLVKLJKHUWKDQWKHVZLWFKRQOLPLWG721WKH
ÀUVWSULRULW\VWRUDJHF\OLQGHULVORDGHGXQWLOLWVWHPSHUDWXUHVHWSRLQWLVUHDFKHG2QO\WKHQVKRXOG
the second-priority cylinder be loaded.
If the second-priority cylinder temperature difference is higher than the switch-on limit (dT ON)
WKRXJK WKH ÀUVWSULRULW\ F\OLQGHU WHPSHUDWXUH GLIIHUHQFH LV QRW \HW WKHQ WKH VHFRQGSULRULW\
F\OLQGHULVORDGHGRQO\XQWLOWKHÀUVWSULRULW\F\OLQGHUKDVUHDFKHGWKHVZLWFKRQOLPLWG7217KLV
VZLWFKRQFRQGLWLRQLVSHULRGLFDOO\FKHFNHGGX35,2SHULRGVHWWLQJLQWKH©6HW&RQÀJªPRGH
while the second-priority cylinder is loaded.
If there is no loading priority
7KHFROGHUF\OLQGHULVORDGHGÀUVW7KLVWHPSHUDWXUHFRQGLWLRQLVSHULRGLFDOO\FKHFNHGGX35,2
SHULRGVHWWLQJLQWKH©6HW&RQÀJªPRGH
HEAT QUANTITY ESTIMATION
This function (only available for systems 1/3) requires an extra sensor (T4) to measure the return
ÁRZ WHPSHUDWXUH LW HVWLPDWHV WKH KHDW IHG LQWR WKH VWRUDJH F\OLQGHU IURP WKH VRODU HQHUJ\
supply system.
$EDVLFÁRZPHWHULVUHTXLUHG7KHYROXPHÁRZYDOXHLQOLWUHVPLQXWHUHDGDWWKHÁRZPHWHU
have to be entered at the SR controller settings (FL L/M).
,IDJO\FRODQWLIUHH]HOLTXLGLVXVHGWKHKHDWWUDQVIHUÁXLGVKDOOEHGHÀQHGWKHJO\FROW\SHDQG
concentration have to be set at the controller.
Heat Quantity Estimation (HQ) to be read in the INFO mode:
HQ KWh Heat Quantity during the last 24H
HQ MWh Heat Quantity in total