Model H1301 Recovery and Recycling System
Installation, Operation and Maintenance Manual
Revision-L September, 2019
Page 20 of 105
IV. System Installation (continued)
G. Source Container Connections (Continued)
Inlet Leak Testing and Evacuation Method:
1. Connect the Agent source container to the Manual Inlet Valve Port. Do not open the
source container.
2. Connect nitrogen gas regulated to the pressure of the Agent source container to the
Inlet Evacuation Valve Port.
3. Open the Evacuation Valve and the Manual Inlet Valve to pressurize the plumbing with
the nitrogen and leak test the plumbing connections using leak detect fluid.
4. Shut off the nitrogen, Close the Evacuation Valve and disconnect the nitrogen.
A valve is installed to the
outlet of the source and is
closed.
Source is positioned to expel liquid first
and strapped to floor restraints to protect
against possible container recoil.
High Pressure Hose