Model H1301 Recovery and Recycling System
Installation, Operation and Maintenance Manual
Revision-L September, 2019
Page 60 of 105
VII. System Maintenance Procedures
K. Complete Machine Evacuation (continued)
2. Nitrogen Supply Installation
a. Install the nitrogen supply as per section-IV.E of this manual.
3. Receiving Container Installation
a. Install the receiving container as per section-IV.F of this manual.
4. Inlet Section Evacuation
a. Verify that all the control panel override toggle switches are in the AUTO position.
b. Place the front panel Power Switch to the ON position. Allow the machine to cool to
the setting of -63 F for 1301 and FE25, -23 F for 1211, or -10 F for FM200
CAUTION: The Manual Inlet Valve MV-1 and the Inlet Evacuation Valve MV-8 must
be closed to prevent air from entering the machine.
c. Place the control panel Inlet Valve Switch to the ON position.
d. Place the control panel Compressor Switch to the ON position. Allow the
compressor to operate for 10-minutes.
WARNING! Do not manually operate the compressor with the inlet valve switch in the
auto position. The compressor will be pumping into dead ended plumbing.
The inlet valve switch must be positioned to the ON position allowing flow
from the compressor discharge to enter the process tank.
e. Place the Compressor Switch to the AUTO position.
f. Place the Inlet Valve Switch to the AUTO position.
5. Complete steps #2 through #18 of section-VII.H: Moisture Acid and Processed
Particulate Filter Element Replacement. This will purge any agent vapor in the inlet and
filter sections of the machine into the process tank.