5.2 Maintenance list
To maintain operational safety the Nordmann RC4/DC4 steam humidier must be maintained at
regular intervals. This is differentiated between the rst maintenance after approx. 500 operat-
ing hours (I), the replacement of the steam cylinder after the yellow LED lights (II) and annual
maintenance (III).
Below you will nd a summary of the work to be carried out for each of the three maintenance stages.
Components Interval Work to be done
I II III
Steam cylinder X Remove and replace.
Drain pump X Remove, disassemble and clean, replace if neces-
sary.
Steam cylinder receptacle X Inspect, clean if necessary.
Inlet valve X Remove and clean lter insert, replace if neces-
sary.
Drain pipe and siphon X Inspect, clean if necessary (decalcify and rinse
out).
Steam installation X X Inspect steam and condensate hoses for cracks
and to see that they are correctly attached, replace
faulty hoses.
Water installation X X Inspect water hoses in the unit for cracks and to
see that they are correctly attached, replace faulty
hoses
Check supply pipe is tight, make tight if necessary.
Clean water lter, if available.
Electrical installation X X Check all cables in the unit are rmly positioned and
examine status of insulation.