EasyManua.ls Logo

Nova NEBULA 55600 - Page 11

Nova NEBULA 55600
47 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
128-0521-002
2. Install Beam member between Stands (Figure above) and tighten the Bolts against beam mounting surface.
3. Position Tray onto Beam and secure with screws and washers
(Figure above) using 6mm Allen key.
4. * Optional additional weight (Quartz sand) in the stabilizing
beam, not included. (Figure right)
ASSEMBLY NOTE
Washer Tray
Spring
Washer
Bolt
Repeat for all 4 bolt holes on Beam
ASSEMBLY NOTE
Washer
Spring
Washer
Bolt
Repeat for all 8 bolt holes on Stand
Additional Weight
Quartz Sand

Related product manuals