Operation Manual
Table of Contents
1 Nomenclature 1-1
1-1 Wafer Loader Main Body ······················································ 1-
1-1-1 AL120-LMB12-F ··········································································· 1-1
1-1-2 AL120-LMB12-LP3········································································· 1-2
1-1-3 BACK PART [MAIN DISCONNECTOR][AL120-LMB12-F] ······························· 1-3
1-1-4 BACK PART [MAIN DISCONNECTOR][AL120-LMB12-LP3] ···························· 1-3
1-1-5 OPERATION PANEL ·········································································· 1-4
1-1-6 FOUP OPENER OPERATION DISPLAY PANEL ············································· 1-4
1-2 Remote Controller (Option) ·················································· 1-5
2 Outline of Operation Procedures 2-1
1 Description of Symbols 2-1
2 Operation Procedure 2-1
2-1 Procedure before Starting Transfer ······································· 2-3
Preparation 2-3
1 Turning the Main Switch ON: Main Switch 2-3
2 Cassette Setting 2-3
3 FOUP OPENER(AL120-LMB12-LP3) 2-4
4 Selecting the Type of Inspection Wafer: 4-way button 2-5
5 Setting the Sequence (Inspection Type: [Observation] Button 2-6
6 Setting the Inspection Mode 2-7
7 Selecting Wafers for Inspection: Wafer No. Selector Button 2-9
8 Setting the Orientation Flat and Notch Positions on the Microscope: [Wafer
alignment] Position Control 2-10
9 Setting the Inspection Time: [Inspection Time] Control 2-10
10 Detailed Settings for the Top Macro Inspection: [Top macro spin direction] and
[Topmacro spin speed] Controls 2-10
11 Setting Wafer Alignment when Unloading a Wafer 2-11
2-2 Vacuum Stage ·································································· 2-13
1 How to Move the Vacuum Stage 2-13
2 How to Use the Grip Handle 2-13
3 How to Use the Wafer Rotating Knob 2-13
2-3 Start of Transfer ································································ 2-14
1 Start of Transfer: [Start] Button 2-14
2 Status of the Loader in Operation 2-14