EasyManua.ls Logo

Omron BU5002R - Page 68

Omron BU5002R
135 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 Checking and starting the operation
3-1 Names and functions of each part of the operation and display sections
BU5002R/BU3002R/BU3002RH
68
■ Operation while the UPS is in use or AC input error
○: ON, ●: OFF
UPS
status
Icon
Symbol
Buzzer
Output
Charge
Text
displayed
on top
Description
Solution
UPS
event
None
OFF
ON
Stand by
Schedule
The UPS is standing
by for scheduled
startup.
-
Stand by
BS signal
The UPS is stopped
by BS signal, and
standing by for
startup.
-
Stand by
RemoteO
FF
The UPS is stopped
by remote signal,
and standing by for
startup.
-
Stand by
Bat.level
The UPS cannot
start because the
battery level is
insufficient.
-
AC I/P
abnormal
-VH
The AC input
voltage is high.
Use the UPS
within the range of
AC input voltage
and frequency
written in the
specifications.
Note: You can check
the input
voltage by
selecting 1.
Measurements
- Input/Output
Meter in the
LCD menu.
AC I/P
abnormal
-VL
The AC input
voltage is low.
AC I/P
abnormal
-FH
The AC input
frequency is high.
AC I/P
abnormal
-FL
The AC input
frequency is low.

Table of Contents

Related product manuals