How to use MEXE02
−52−
I/O test
I/O signals can be tested.
Input signals can be monitored, and output signals can forcibly be turned ON or OFF to check the connection with a
programmable controller.
Also, setting values of operation data converted from the input values from the internal potentiometer and external
setting device are shown. Even if the motor is not rotated actually, the setting values (rotation speed, torque limiting
value, acceleration time, deceleration time) over the input values can be checked.
Refer to the operating manual of the
MEXE02
for the operating method and others.
Note
•
Output signals can forcibly be turned ON or OFF with I/O test. Therefore, other devices connected to
the applicable product may operate. Before operation, check the condition of the surrounding area to
ensure safety.
•
Teaching/remote operation and I/O test cannot be executed at the same time.
•
The Y2 (SPEED-OUT) output signal cannot be tested.