EasyManua.ls Logo

Pearson CE35-T Case - Operating Sequence; Machine Operating Sequence

Pearson CE35-T Case
144 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating Sequence
In This Chapter
This chapter provides a detailed sequence of
machine operation.
Machine Operating Sequence
1. Knocked down blanks are stacked
on edge on the bed of the case
magazine.
2. Vacuum cups mounted on the
pickoff arm grab one knocked
down blank from the magazine.
Operations Manual CE35-T Case Erector
M-CE35T-2c Horiz Mag 3/2/2010
Operating Sequence
27
Fig. 17: Blanks Stacked in Magazine
Fig. 18: Pickoff Arm Pulling Blank from
Magazine
Pickoff Arm

Table of Contents