EasyManua.ls Logo

Pentair AUTOTROL 604 - Time Clock Regeneration (604 Only); Volumetric Regeneration (606 Only); Calendar Override Setting (606 Only)

Pentair AUTOTROL 604
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installer Manual Autotrol 368 / 604-606 - Programming
Ref. MKT-IM-007 / A - 16.12.2016 29 / 54
6.3. Time clock regeneration (604 only)
Set the time between each regeneration.
6.4. Volumetric regeneration (606 only)
Set the capacity in [m
3
] between each regeneration.
6.5. Calendar override setting (606 only)
The 606 controller needs a method to set days between regeneration for regulatory requirements and
in cases when the flow sensor has failed.
A Press until desired interval appears then release.
→ Range from 0 through 30;
0 = Disabled;
0.3 = Regeneration every 8 hours : at 2, 10 and 18 hours;
0.5 = Regeneration every 12 hours : at 2 and 14 hours;
1 - 30 = Regeneration every X days (every 3 days in this
example).
A Press until desired capacity appears then release.
→ Range from 0.4 to 9.5 m
3
;
from 0.4 m
3
to 1.0 m
3
by increments of 0.05 m
3
(12 increments);
from 1.0 m
3
to 3.0 m
3
by increments of 0.1 m
3
(20 increments);
from 3.0 m
3
to 5.0 m
3
by increments of 0.2 m
3
(10 increments);
from 5.0 m
3
to 9.5 m
3
by increments of 0.5 m
3
(10 increments).
A Press and hold and for 3 seconds.
→ The programmed calendar override is displayed.
B Press to increases value.
→ Range from 0 through 30;
0 = Disabled;
0.3 = Regeneration every 8 hours : at 2, 10 and 18 hours;
0.5 = Regeneration every 12 hours : at 2 and 14 hours;
1 - 30 = Regeneration every X days (every 3 days in this
example).

Table of Contents

Other manuals for Pentair AUTOTROL 604

Related product manuals