EasyManuals Logo

Precor C842 User Manual

Precor C842
87 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #76 background imageLoading...
Page #76 background image
C842, C842i, C846, C846i Upright and Recumbent Cycle
Page 76
24. Insert an allen wrench into the left end of the secondary pulley shaft, thread the secondary
axle onto the secondary axle and tighten with a 20030-119 secondary sheave tool and a
1/2 inch drive socket wrench.
25. Replace the inside retaining ring, removed in step 19, onto the secondary pulley shaft. Slide
one of the thrust washers onto the secondary pulley shaft.
26. Slide the replacement secondary pulley onto the secondary pulley shaft.
27. Slide the remaining thrust washer onto the secondary pulley shaft. Replace the outside
retaining ring, removed in step 17.
28. Route the secondary belt over the secondary pulley and the generator pulley. Tension the
secondary belt per Procedure 5.2.
29. If necessary, route the primary belt around the primary pulley, over the idler pulley and
around the secondary axle as shown in Diagram 7.23. Tension the primary belt per
Procedure 5.1.
30. Replace the left, right and top covers.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Precor C842 and is the answer not in the manual?

Precor C842 Specifications

General IconGeneral
BrandPrecor
ModelC842
CategoryExercise Bike
LanguageEnglish

Related product manuals