7. Installation and start-up
Premier Tech 32 / 64 Solido SMART
DOKK5110E 15.04.2020
Attached in the container:
Attached in the container:
Air inlet support with 3 m hose, DN25
Upper piece of the sludge removal pipe, DN160
Cover for sludge removal pipe, DN160
Air vent for air inlet support
tube diffuser with hose, DN13 and/or DN16
(tank M2: additional tube diffuser, T-piece, stop cock)
Optional, without a figure: DN16 nozzle for tube diffuser (from
compressor HP-120 onwards)
Important note:
The diagram showing the scope of delivery and the following installation steps
apply to the standard version single-container plant.
Please note information for plants with pumped outlet in separate manual
DOKK7314E, which is included in the delivery and part of warranty conditions.