93-530-70 Issue 0 Page 29 of 44 © Protec Fire Detection PLC 2007
17.0 Delaying Fire Link Activations
It is possible for an engineer (at access Level 3) to allow a delay time before the Fire Link interface (if
fitted) activates.
1. From access level 1 enter the 5 digit engineer code 1 3 4 2 4. The ‘Supply Present’ indicator
will flash indicating level 3 has been accessed and all programming features are available.
2. Using button 2 scroll to the ‘Alarm Outputs’ indication. Any current settings in this option will be
displayed on row 1 of the display, on zone 5. Accept this option by pressing button 3.
3. The ‘Alarm Outputs’ indicator will flash, showing this option has been accepted.
4. Select the ‘Delay Fire Link’ option by pressing button 2 until the row 2 indicator for zone 5 is
illuminated.
5. Press button 1 to show that the Fire Link is to be delayed / not delayed. The row 1 zone 5 indicator
will be illuminated if fire link activations are delayed.
6. Press button 3 to return to the selection menu.
7. Press button 4 to accept and program the set-up and return to access level 2.
8. The ‘Output Delay’ indicator will be illuminated, showing that the system has a delay programmed.
Note: The Fire Link delay time is set up locally on the Fire Link interface. Please consult the
installation sheet for that product for further details.