Pulsar® Precision Operaon and Installaon Manual (Model PS-1HCE) Rev 2.0 04/2022
10
4.2.2 EssenalEquipmentSuppliedbyOthers
1 ½" Sch 40 pipe
Two (2) 1 ½" ball valves
1 ½" Sch 40 elbows, 45° and 90°
1/2" [1.27 cm] exible tubing
PVC primer and glue
Saddle clamps for connecon to 1 ½" PVC pipe from pool return (oponal)
Plumber's tape
4.2.3 COTSTools
Drill
1 ¾" hole saw and 1 ½" NPT tap (oponal)
11/16" drill bit and 1/2" NPT tap
Saddle clamps (oponal)
Pipe wrenches or gas pliers
Tubing cuers
Saw (to cut PVC pipe)
4.2.4 PPE
Safety glasses
Rubber gloves
Apron
4.3 Pre-InstallaonChecklist
Table1. Pre-installaonChecklist
ItemNo Check Completed?
1 Is a licensed electrician available to perform necessary electrical wiring of the booster pump?
2 Does the site meet all criteria noted in Secon 4.1.1, Site Requirements on page 9?
3 Have inlet and outlet locaons on the pool return post lter been idened?
4 Are all Pulsar® Precision components on hand?
5 Is all essenal equipment supplied by others on hand?
6 Are all COTS tools and other equipment on hand?
7 Is all PPE on hand?