EasyManua.ls Logo

Pylontech PowerCube-H1-V2 - Installation; Installation Tools; Safety Gears

Pylontech PowerCube-H1-V2
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Installation
Please check every installation step in detail at <Annex 1: Installation and System Turn ON
Progress List> during the installation.
It is recommended to wear the following safety gear when dealing with the battery pack.
3.2. Safety Gears
The following tools are required to install the battery pack:
3.1. Installation tools
Adjustable Wrench 1000VDC MultimeterSleeve Piece
Screw Driver Set Electric Screw Driver
Wire Cutter Wire CutterCrimping Modular Plier
Note
Use properly insulated tools to prevent accidental electric shock or short circuits.
If insulated tools are not available, cover the entire exposed metal surfaces with available insulated
alternatives, except their tips, with electrical tapes.
Insulated gloves Safety shoesSafety goggles
17
/
42

Table of Contents

Related product manuals