Install the buckle nuts. The position of nuts must meet the position of the control module (BMS).
Install the control module (BMS) in. Each module uses 4 screws to fix.
3.5.4. Mechanical Installation of the control module
Single battery module is 24/32kg. If without handling tools must have more than 1 man to handling with
it.
Install the buckle nuts. The position of nuts must meet the position of the battery modules.
Install the all battery modules in. Each module uses 4 screws to fix.
3.5.3. Mechanical Installation of the battery module
23
/
42