EasyManua.ls Logo

qubev smart EVON0090 - Table of Contents; Support

qubev smart EVON0090
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Support
QUBEVSM-V01-R0 Installation and Operation Manual Intelligent Electric Vehicle Chargepoints
February 2023 Page 2 of 42
Contents
Support 2
Safety 3
Safety Advice within this Manual 3
Product Features 4
About Load Balancing 4
About Demand Side Response 4
About PEN Protection 5
Product Specification 6
Physical Specification 6
Electrical Specification 8
Certifications and Compliances 8
Labelling 9
Unpacking 9
Typical Contents 9
Typical Options 9
Installation 10
Before Installation 10
If a Mounting Post Will be Used 12
Schematic Diagrams 13
Installation Procedure 15
Install Load Balancing 18
Overview 18
Connect the CT to the Property 18
Connect a 3-Phase CT to the Property 19
Extend the CT Cable 19
Solar Integration 20
Connect the CT Cable to the Chargepoint 20
Configure Load Balancing 21
Install Cable Tidy/Hanger 22
Testing 23
Application Setup 24
Register 24
Add a Device 25
Remove a Device 26
Functional Check 27
Configure Load Balancing 28
Change the Load Balancing Setting 30
OCPP IP and ID Settings 31
Operation 31
Share a Connection 31
Charger Status Indications 33
Operational Indications 33
Fault Indications 33
Charger Button Functions 34
Charge a Vehicle 35
Charging Modes 35
Plug and Charge 35
Schedule Mode 36
Create a Schedule: 37
Delete a Schedule 37
ECO Mode 38
Other Application Features 39
Edit Charger Details 39
Record Screen 39
Maintenance 40
Disposal 41
Warranty 42
Support
For assistance with the installation or operation of this product, contact your preferred electrical
installer.