Installing WinLink 1000 Units 1
Quick Start Guide
Installation of WinLink 1000 should be carried out only by a qualified
technician. If you are familiar with WinLink 1000, use this guide to
prepare the units for operation.
1. Installing WinLink 1000 Units
ODU Package Contents:
• ODU
• Mast/Wall mounting kit
• WinLink 1000 Management software installation CD
• Mounting instructions
• Spare RJ-45 connector
• ODU to IDU cable at length ordered (optional)
IDU-E Package Contents:
• IDU-E
• 110V/240V adaptor
• IDU wall-mounting drilling template
• Spare RJ-45 connector
(Optional) IDU-C Package Contents:
• IDU-C
• For AC model, 110v/240 VAC with 3-prong connector cable
• For DC model, -48 VDC with 3-pin terminal block connector (green)
• IDU standard 1-U, 19” carrier rack
• Spare RJ-45 connector
Equipment Required:
• RJ-45 crimp tool (If pre-assembled cable is not used)