R&S ESU Instrument Functions
Receiver Mode
4.48 Operating Manual 1302.6163.12 - 03
In the FINAL MEAS side menu, the following softkeys are available:
ESH2-Z5 |
ESH3-Z5 |
ENV 4200 |
ENV 216 |
OFF
The ESH2-Z5, ESH3-Z5, ENV 4200, ENV 216 and OFF softkeys allow to select the
V-network to be controlled via the user port.
Remote command: :INPut:LISN[:TYPE] TWOPhase| FOURphase|
ENV4200 | ENV216 | OFF
PRESCAN
PHASES |
FINAL PHASES
The PRESCAN PHASES and FINAL PHASES softkeys open the submenu for the
selection of phase and protective earth setting.
PHASE N |
PHASE L1 |
PHASE L2 |
PHASE L3
The PHASE N, PHASE L1, PHASE L2 and PHASE L3 softkeys select the phase of
the V-network on which the RFI voltage is to be measured.
Remote command: :INP:LISN:PHAS L1 | L2 | L3 | N
ESH2-Z5 | ESH3-Z5 |
ENV 4200 | ENV 216 |
OFF
PRESCAN PHASES |
FINAL PHASES
!
PHASE N | PHASE L1 |
PHASE L2 | PHASE L3
150 KHZ HIGHPASS
PE GROUNDED | PE
FLOATING
RUN FINAL MEAS
! HOLD FINAL MEAS! AUTOMATIC FINAL
INTER ACTIVE
MEASURE
STOP FINAL MEAS STOP FINAL MEAS
ESH2-Z5 four-line V-network is controlled.
ESH3-Z5 two-line V-network is controlled.
ENV 4200 four-line V-network is controlled.
ENV 216 two-line V-network is controlled.
OFF remote control is deactivated.
PRESCAN PHASES: Softkeys ESH2-Z5, ESH3-Z5, ENV 4200, ENV 216 and
OFF or PHASE N, PHASE L1, PHASE L2 and PHASE
L3 as well as PE GROUNDED and PE FLOATING are
toggle keys. Only one of them can be activated at a time.
FINAL PHASES: All combinations of phases and PE setting are possible.
PHASE N RFI on phase N is measured,
PHASE L1 RFI on phase L1 is measured,
PHASE L2 RFI on phase L2 is measured
(only for ESH2-Z5/ENV 4200),
PHASE L3 RFI on phase L3 is measured
(only for ESH2-Z5/ENV 4200).