EasyManua.ls Logo

Raven AccuFlow - Page 52

Raven AccuFlow
90 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 6
48 AccuFlow™ and AccuFlow HP™ Installation & Operation Manual
e. Begin application. Product 2 actual pressure should now show at target pressure and product 1 should
be at target application rate. If product 1 still cannot reach the target rate, increase the target rate for
product 2 in increments of 5 PSI [34 kPa] using the rate bump or INC/DEC switch.
Note: Refer to the Chapter 7, Service and Maintenance, for details on performing maintenance on the
AccuFlow system.
10. If an additive such as N-Serve (Dow Chemical) or ACA (Amoco) is used with the system, periodic cleaning
of the AccuFlow flow meter may be required. Refer to Chapter 7, Service and Maintenance, for instructions
on performing maintenance on the AccuFlow cooler or flow meter.

Table of Contents

Related product manuals