Unit assembly
42 © robatherm
6. Fit drip edge overlapping parts (F)
over the drip edge (D) at the
separation point (C).
Fig. 56: Fitting drip edge overlapping
part
7. Fasten drip edge overlapping
parts (F) with the supplied
connecting screws (window screw
JD-22 3.9 x 16 mm, with drill
point, binding head H,
galvanized).
Fig. 57: Mounting drip edge overlapping
part
Installation temperature must be at least
+10 °C.
Fig. 58: Installation temperature
8. At temperatures below +10 °C,
roofing membranes next to the
separation point (C) and roofing
membrane stripes (G) must be
preheated with hot air.
Fig. 59: Preheating